Most problems in smart home systems come not from the technology but from late planning. A cable added after plastering, a panel that cannot find its place or a motor that does not fit the curtain pocket all mean compromising the architectural design. In this guide we summarise what should be considered at each stage of the architectural project.
1. Concept stage
- Define the scope: Which of the lighting, curtain, climate, audio, security and network systems will be included in the automation?
- Allocate a technical room: Plan a ventilated, easily accessible space for the rack cabinet and automation panels.
- Set the interface language: The material, colour and form of switches and panels should be chosen together with the interior design language.
2. Detailed design stage
- Switch layout: Should be considered together with door swings, furniture and wall finishes. Smart systems use fewer but more functional switches.
- Curtain pockets: Pocket depth and power supply for motorised curtains and blinds should be shown in the details.
- Speakers and screens: Ceiling height and void for in-ceiling speakers, and cable routes for TVs and projectors, should be defined.
- Lighting circuits: Which fixtures are controlled separately for scenes should be marked on the lighting plan.
- Wi-Fi coverage: Access points should be planned on the ceiling in positions that are right for both aesthetics and coverage.
3. Shell construction and cabling
- Automation cabling should be carried out at the same time as, and coordinated with, the electrical installation.
- Critical systems (lighting, curtains, climate) should be wired wherever possible.
- Every cable should be labelled and recorded on the as-built drawings.
4. Finishing works and handover
- Switches and panels should be fitted after painting and finishing works are complete.
- Programming should follow the users’ daily routines, and training should be given at handover.
- As-built drawings and the user guide should be added to the project file.
Quick checklist
- Has the technical room / rack position been defined?
- Does the switch and panel design suit the interior design?
- Are the curtain pockets large enough for motors?
- Have speaker, screen and access point positions been drawn?
- Have lighting circuits been split according to scenes?
- Has cabling been coordinated with the electrical team?
At Punica Systems we work with architecture practices from the earliest stage of a project and prepare system schematics, device lists and layout plans. For details, see our For Architects page.